When choosing an electrical contractor for a Riyadh project, first check that each bidder is pricing the same installation. A quote that includes lighting and wiring can still leave out containment, work outside normal hours or the documents you need at handover. Ask bidders to mark those boundaries in writing before you compare prices.
Give every bidder the same drawings
Issue a short drawing register with the file name, revision and date of each document. Include the latest electrical layout, single-line diagram, panel and lighting schedules, and bill of quantities (BOQ) where available. For a fit-out or refurbishment, identify which equipment stays and what existing conditions still need to be checked on site.
When the quantities and drawings disagree, flag the discrepancy in one written clarification and share it with each bidder. Ask them to identify which documents and quantities they used. If a route or quantity still needs a survey, have each bidder state its allowance and how a change will be priced.
Confirm where the electrical package starts and ends
Ask each contractor to mark the work it will supply, install and hand over, and the work that stays with the client or another trade. Review items that are easily missed on a fit-out:
- Materials and installation. Compare who provides panels, cable containment, wiring and fixtures. Ask each bidder to show any substitution and its effect on price or lead time.
- Work by other trades. Confirm who provides openings and supports and who reinstates finishes after the electrical work. If ceiling space is shared with mechanical or plumbing services, identify who coordinates the route before installation.
- Testing and handover. Agree which tests and records the project team expects, and who provides labels, marked-up drawings or other handover documents where required by the scope.
Walk through access before accepting the programme
Tell bidders whether the premises will be occupied, which work areas can be released, what delivery and storage space is available and when noisy or disruptive work can take place. For an existing installation, ask the responsible project team to confirm available shutdown windows and who authorises access and restoration. Have each bidder show how those constraints affect the sequence, working hours and earliest practical start.
Check the proposed team and similar work
Ask who will supervise the installation, handle drawing questions and coordinate with the other trades. Request an example of a comparable completed scope that the contractor can share with permission. For an occupied fit-out, look for evidence that the team has worked under similar access and handover constraints. Record who will answer site questions and approve variations.
Compare written offers on the same basis
Keep a comparison sheet with one row per disputed item. For each bidder, record whether the item is included, excluded, provisional or still unconfirmed. Compare material specifications, shutdown assumptions, exclusions, handover deliverables and quotation validity alongside the total. Ask for the revised total once both bidders have priced the same scope.
Example. Two bids include the lighting layout, but only one includes the cable tray supports and weekend access. Ask the other bidder to price those items separately and confirm which party reinstates the ceiling. You can then compare the revised totals or keep the same clearly recorded exclusions in both offers.
Before awarding the work, keep the accepted drawing revision, scope, exceptions, programme and variation process together with the final quotation. If mechanical and plumbing work is also being priced, use the MEP quotation checklist to set out responsibilities across the trades.